top of page

Parrott Dr / Alameda de las Pulgas Intersection Improvements Update

Updated: Jun 27


As the highest priority identified in the Baywood Neighborhood’s Traffic Action Plan, the intersection of Parrott Drive and Alameda de las Pulgas is scheduled for permanent safety improvements. This project will transition current temporary measures into permanent and lasting improvements designed to enhance pedestrian safety.


The project features: 

  • New pavement markings Improved centerline striping to better support bus movements 

  • New "KEEP CLEAR" markings to improve the connection to Columbia Dr 

  • Reinstallation of second southbound through lane 

  • Pavement coatings to better define pedestrian spaces 

  • Replacement of existing temporary delineators with lower-profile rubberized curbs and surface-mounted flexible posts to enhance aesthetics and provide a more durable treatment for the closed free-right turn areas 


Construction will begin in early July and last for about 1 week.  Construction hours will be from 7:30am to 4:30 pm and will include intermittent lane closures.  


A postcard was mailed to nearby residents and emails sent to residents who had attended past project meetings or filled out the project’s online survey.  Please watch for any updates at www.cityofsanmateo.org/3129/Baywood.  You always can contact me at ldiaznash@cityofsanmateo.org.

 
 
 

コメント


LET'S WORK TOGETHER

Support Lisa

GET INVOLVED

LET'S STAY CONNECTED

Sign up to get the latest
LisaDiazNash_SquareLogo2r.png
  • White Facebook Icon
  • Instagram

Copyright 2022

Paid for by Nash for City Council 2022 FPPC #1447823

Labor Donated

bottom of page